• Tanzania
    With an area of 8.5 million square kilometers,

  • Uganda
    Invest in Tourism in Africa's fastest growing economy

  • Rwanda
    100 % Government support in logistics investments

  • Burundi
    Lorem ipsum dolor sit amet, consectetur adipiscing elit.

  • DRC Congo
    Lorem ipsum dolor sit amet, dolore eiusmod quis

CC-TTFA PROJECT MANAGEMENT

Kigoma Port

Modernization of Kigoma Port

View

Customs Territory

Single Customs Territory

View

Trade Facilitation

Enhancement of Other Trade Facilitation Issues

View

NTBs Elimination

Elimination of the existing NTBs along the CC.Report to (2nd Summit)

View

E-services

E­-Services

View

Cyber Security

Cyber Security

View

ICT Infrastructure

ICT Infrastructure and Board

View

Kyotera-Mutukula Road

Kyotera-Mutukula Road

View

Nyahua-Chaya Road

Nyahua-Chaya Road

View

Dar-Chalinze Toll Road

Dar-Chalinze Toll Road

View

Dar Port Berth ....

Dar Port Berth Development 13 & 14

View

Rutshuru-Bunagana

Rehabilitation of Rutshuru-Bunagana road (34km)

View

Minova-Goma

Rehabilitation of Minova-Goma road (66km)

View

Kavumu-Minova

Upgrading of Kavumu-Minova road (116km)

View

Bukavu-Kavumu

Upgrading of Bukavu-Kavumu road (45km)

View

Kamanyola-Bukavu

Upgrading of Kamanyola-Bukavu road (55km)

View

Kavimvira-Kamanyola

Rehabilitation of Kavimvira-Kamanyola road

View

Walikale-Kisangani road

Walikale-Kisangani road

View

Musenge-Walikale

Musenge-Walikale

View

Hombo-Musenge

Hombo-Musenge

View

Bukavu–Hombo

Bukavu–Hombo

View

Bugesera Airport

Construction of Bugesera Airport Expressway (80km)

View

Ngoma-Bugesera-Nyanza

Upgrading of Ngoma-Bugesera-Nyanza road (130km)

View

Kyotera-Mutukura road

Kyotera-Mutukura road (43km)

View

Masaka-Kyotera road-45k

Masaka-Kyotera road (45km)

View

Dar -Chalinze Way

Dar-es-Salaam-Chalinze Express way (100km)

View

Chagu-Kazilambwa road

Chagu-Kazilambwa road (40km)

View

Urambo-Kaliua road-33km

Urambo-Kaliua road (33km)

View

Malagarasi-Uvinza-51km

Malagarasi-Uvinza road (51km)

View

NyahuaChaya road-85.4km

Nyahua-Chaya road (85.4km)

View

HEP Dam

Hydropower dam and plant on the Lukuga river

View

Kalemie and Kalundu

Rehabilitation, modernization and Navigability improvement of Kalemie and Kalundu ports

View

Lake Kivu Project

Lake Kivu Water Transport Project

View

Akagera river navigate

The navigability of Akagera river

View

Feasibility Study

Feasibility and engineering study for the development of transport corridor on the lake Tanganyika

View

Bujumbura Port

Extension of Bujumbura port

View

Bujumbura Bypass

Bypass Road Bujumbura City: 30 km

View

Mabanda-Rutana-Bujumbra

Mabanda-Rutana-Bujumbura (200 km) road: Alternative road) : Rehabilitation

View

Bujumbura Rumonge

Bujumbura Rumonge road (78km)

View

Port Bell & Jinja Port

Port Bell and Jinja Port

View

Karema port

Development of Karema port

View

Mwanza South Port

Modernization of Mwanza South Port

View

Construction of Berths

Expansion of Dar es salaam port (construction of Berths 13 & 14)

View

Entrance channel

Dredging and widening of entrance channel and Turning Basin

View

Berths 17 and RoRo

Deepening and Strengthening of berths 17 and construction of RoRo

View

Cross cutting

Cross cutting

View

Value Corridor

Value Corridor

View

Kalemie-Kabalo Upgrade

Rehabilitation and upgrading of Kalemie-Kabalo,Kindu/ Kamina railway (1,200km)

View

Uvinza-Musongati SGR

Uvinza-Musongati SGR (227km)

View

Mpanda-Karema SGR

Construction of the new Mpanda-Karema SGR (150km)

View

Kaliua-Mpanda SGR

Construction of the new Kaliua-Mpanda SGR (210km)

View

Tabora-Kigoma SGR

Construction of the new Tabora-Kigoma SGR (411km)

View

Isaka-Mwanza SGR

Construction of the new Isaka-Mwanza SGR (250km)

View

TIRP

Tanzania Intermodal Railway Project (TIRP): Upgrading of the existing Dar es Salaam-Isaka (Phase I) Meter Gauge

View

Railway Project

The Dar es Salaam-Isaka-KezaKigaliMu songati Standard Gauge Railway (1.673km)

View

Interconnectivity

Interconnectivity:East African Power Pool Power system Master Plan

View

Transmission

Transmission

View

Power Generation

Power Generation

View

Safety and Security

Safety and Security

View

Aviation Safety

Aviation Safety and Security

View

Aviation safety

Aviation safety and security

View

Aircraft Liberalization

Liberalization of the Air Transport within Central Corridor Member States

View

ICT Skills

ICT Skills and Human Capacity Development

View

Bujumbura-Rumonge Road

Bujumbura-Rumonge Road

View

Malagarasi-Univiza Road

Malagarasi-Univiza Road

View

Kigoma Port Upgrade

Kigoma Port Upgrade

View

Port Bell and Jinja ..

Port Bell and Jinja Pier

View

Akagera River Naviga..

Navigability of the Akagera River

View

Dar-Isaka-Keza-Kigali..

Dar-Isaka-Keza-Kigali/Gitega-Musongati Railway Line

View